Fire Protection Contractors on Switching to Inspect Point
One went from 20% proposal acceptance to 70%+. Another tripled daily inspection output. Here's what they have to say.
What Changed for These Contractors
"Without Inspect Point, our efficiency would be 30%. With Inspect Point, our efficiency is closer to 90%."
Dino Rocco, Mack Fire
"Our deficiency proposal acceptances went from 20% to over 70%."
Derrick Martin, Getz Fire Equipment
"Saved us hours, took the paper off our back counter, and increased proposals accepted by 40%."
Wendy Griepentrog, H.J. Pertzborn
The Problems They Left Behind
Paper everywhere
Printing forms, mailing reports, and digging through filing cabinets for inspection records that should be easy to find.
Inconsistent processes
Different forms for different inspectors. No standard way to document deficiencies, so follow-ups fall through and some never get quoted.
Slow turnaround
Reports pile up at the office. Proposals wait days. In fire protection, the first contractor to send a proposal usually gets the job.
AHJ submissions done by hand
Manual uploads to compliance portals. Missed deadlines. One rejected submission can void the whole inspection.
Sound familiar?
These contractors had the same problems. A 30-minute demo is the fastest way to see the fix.
Schedule a WalkthroughBefore and After Inspect Point
- Paper forms and carbon copies
- Reports completed back at the office
- Manual proposals that take hours
- Separate systems for inspections and proposals
- Portal-by-portal compliance submissions
- Digital inspections on any device
- Reports updated from the field, in real time
- Proposals generated in minutes
- One platform from inspection to signed proposal
- Reports submitted directly to AHJ compliance portals
Common Questions
Ready to Get Results Like These?
Book a demo and see how these contractors get inspections done and proposals out the same day.
Book Your Demo